Department of Defense Lean Six Sigma

Gordon England, the Deputy Secretary of Defense, signed a directive establishing policy and assigning responsibilities to institutionalize the effort throughout DoD. See a webcast of his speech [the broken link was removed] on lean six sigma to a DoD conference on continuous process improvement.

Leading Business Transformation the “Lean” Way [the broken link was removed]

Since it began employing LSS, the Department of the Navy (DON) has completed 1,700 Black Belt/Green Belt projects and over 2,000 Kaizen events (i.e., action-oriented events designed to improve existing processes). Initial projects were designed to build confidence and gain momentum for success in high-impact core business value streams. The DON’s total of 3,399 trained LSS Green Belts exceeds the Secretary’s goal of 2,000 by the end of 2006, and of the 935 trained LSS Black Belts in the DON, 93 have attained American Society for Quality (ASQ) Black Belt certification.

Naval Air Systems Command (NAVAIR) joined with Raytheon to complete an LSS project, which ultimately saved $133.5M across the 2006 FYDP and $421M over the life of the Joint Standoff Weapon (JSOW) Block II program. The integrated product team developed a three-tier approach to reducing weapon unit cost over a two-year period. Success of the JSOW program has led to development of a follow-on Block III weapon system.

The Marine Corps is applying LSS concepts, analytic techniques, and tools to improve the process for identifying, evaluating and acquiring critically needed warfighting equipment. Initial analysis focused on the evaluation stage, where improvements reduced the time required for this step by 35% – from 131 days to 85 days – and identified savings valued at $135K per year.

The first LSS initiative for Army aviation scheduled maintenance was deemed a success and signals a more efficient future for maintaining the Fort Rucker helicopter fleet. More than 32 days of scheduled maintenance were saved during the first LSS effort for Aviation Unit Maintenance involving UH-60 Black Hawk helicopter scheduled maintenance. The first helicopter inducted into the newly developed process was returned to flying status in just 18 days, which included a four-day break for the Fourth of July weekend. That is a 67% improvement in phase flow efficiency from the previous average time of more than 50 days of phase cycle maintenance for the UH-60.

See: online six sigma resources and lean manufacturing resources from the Curious Cat management improvement web site.

Related: Government Lean Six SigmaPublic Sector Continuous Improvement Site – Transformation Through Lean Six Sigma [the broken link was removed] – Army Business Transformation [the broken link was removed] – History Of Quality Management OnlineMore Lean GovernmentArmy Lean Six Sigma
Doing More With Less in the Public Sector: A Progress Report from Madison, Wisconsin by William G. Hunter, Jan O’Neill, and Carol Wallen, June 1986.

This entry was posted in Lean thinking, Management, Public Sector, Six sigma and tagged , , , , . Bookmark the permalink.